HOTLINE:(86)-510-88568099
CHINESE SEARCH

Successful Installation&Operation of Polymer Preparation System at Xinlong WWTP.

Release time: 2023-08-29Page View:
 

Successful Installation and Operation of Triple-Chamber Automatic Polymer Preparation System at  Xinlong WWTP.

 

In the Middle of August, the polymer station PJY-4500 has been successful installed and operated at Xinlong WWTP. It was designed to meet the demands of modern wastewater treatment processes, this remarkable system showcases advanced technology and precision engineering.


The Triple-Chamber Automatic Polymer Preparation System,constructed from high-quality SS304,  boasts robustness and longevity, ensuring optimal performance over an extended period.


Equipped with Siemens PLC and Siemens touchscreen, along with Schneider electrical components and ABB inverter, the system exemplifies the integration of industry-leading technologies. The touchscreen interface provides operators with intuitive control and monitoring capabilities, including feedback on feeder frequency, inlet water flow rate, dosage and concentration settings, and more.

As the Triple-Chamber Automatic Polymer preparation System enters full operation, it is expected to play a significant role in wastewater treatment process, offering efficiency, reliability, and precision. Yixing Pioniere remains committed to driving technological advancement in the field of water treatment and continues to develop innovative solutions to meet the evolving needs of their clients.

 


For more information about the Triple-Chamber Automatic Polymer Preparation System and other sludge dewatering products and services offered by PIONIERE, please email us: pioniere@pioniere.cn.